History

The scientific and technical potential and the high responsibility of the company that has kept up the traditions of the defense industry,
the importance and significance of the decisions have defined the main priorities of the company.

1955 – 2001

The industrial enterprise developed automated control systems for the manufacture of explosives. The developments were put into production and were successfully operated during many years.

2001 – 2005

  • A new strategy is adopted – development within the trend of electrotechnical production
  • The Company has worked out new technological solutions for the power supply systems of Gazprom, Rosneft, Rosatom, Sibur Holding, mining and concrete complexes

2006 – 2010

  • Mastering of licensed production of medium voltage equipment
  • A site for manufacture of modular equipment was created and put into operation

2011 – 2015

  • Organized by the project activity
  • The first general contracting projects for energy supply of oil and gas industry, the power grid sector and other sectors of the Russian industry were implemented
  • Opinion on successful completion of certification of Rosseti OJSC is received for package transformer substations (PTS)
  • Declarations of correspondence to European quality standards are received for four equipment types, including PTS
  • TS (Transformer Substation) reconstruction project is implemented – 6 (10) / 0.4 KV and creation of inert combined network of 6 (10) / 0.95 / 0.4 KV
  • New products are worked out: complete indoor substations based on unified block modules 110-35 kV (CISS), autonomous power supplies (APS) of remote and residential facilities
  • The Project “Construction of Complete Indoor Substation CISS – 110 (35) kV ” becomes the winner of Regional Innovations – 2014 competition as the Construction Innovation

2016 – 2017

  • The production facilities have been reorganized to increase the volumes of output products
  • The company developed a product – integrated installations on the basis of packaged transformer substations with DDG reserve power source (IIRPS) and delivered the first supplies to the facilities of Transneft, PJSC
  • The company developed a line of autonomous modular packaged power installations (MPPI) on the basis of alternative power sources. The first deliveries of MPPI of various modifications are made to the facilities of Gazprom, PJSC
  • The company implemented a project for the construction of a trial design complete indoor substation based on unified block modules CISS – 110 (35) kV